Home / Local Authorities / England / North Hertfordshire

North Hertfordshire Broadband Coverage

Data updated June 2026

Every figure on PlainBroadband is rendered directly from Ofcom Connected Nations data, no number is typed in by an editor. Local authority figures are computed directly from Ofcom Connected Nations data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.

Ranked #260 of 361 UK local authorities by full-fibre coverage. 68.7% is below the UK national average of 77.5%.

The verdict

North Hertfordshire is mid-table for full-fibre, with room to close the gap - ranked #260 of 361 UK local authorities (bottom 28.3%) with 68.7% full-fibre coverage, 8.8pp below the 77.5% UK average.

#260 of 361 UK authorities
Bottom 28.3% for full-fibre coverage
−8.8pp vs 77.5% UK average
0.1% below USO minimum

About Broadband in North Hertfordshire

North Hertfordshire is a local authority district in England with 62,904 premises in the Ofcom Connected Nations 2025 dataset. Full-fibre (FTTP) broadband is available to 68.7% of premises, and gigabit-capable connectivity reaches 84.5%. Superfast broadband (≥30 Mbit/s) is accessible to 98% of premises. North Hertfordshire ranks 260th nationally out of 361 local authorities by full-fibre coverage.

The gigabit and full-fibre figures reflect the proportion of addresses that can order an FTTP connection from at least one provider, availability does not imply that every household has taken up a service. Full-fibre take-up across all premises stands at 29%, and among premises where coverage is available the figure is 42%. Ofcom defines gigabit-capable as the ability to receive download speeds of at least 1,000 Mbit/s, which in practice means a full-fibre or qualifying cable network must pass the property.

Some 0.1% of premises remain below the Universal Service Obligation threshold of 10 Mbit/s download / 1 Mbit/s upload, indicating a modest but real connectivity gap for the most remote properties in the area. Fixed wireless access (FWA) is available to 0.2% of premises, providing an alternative to fixed-line broadband for homes and businesses that cannot easily receive FTTP. Figures are drawn from operator network-coverage data submitted to Ofcom and verified through the Connected Nations 2025 methodology. See our methodology page for full details on how premises counts and coverage percentages are calculated.

68.7%
Full-Fibre (FTTP)
84.5%
Gigabit-Capable
98%
Superfast (≥30 Mbit/s)
0.1%
Below USO

Coverage by Technology - North Hertfordshire

Full-Fibre (FTTP)68.7%Gigabit-capable84.5%Ultrafast (≥300 Mbit/s)85%Superfast (≥30 Mbit/s)98%NGA (any next-gen)99.2%
Broadband coverage by technology type - North Hertfordshire, Ofcom Connected Nations 2025

Where North Hertfordshire Sits Nationally

North Hertfordshire vs every UK local authority

Full-fibre coverage distribution across all 361 UK local authorities. North Hertfordshire's 68.7% places it in the highlighted band.

68.7% Bottom 28.3% ranked #260 of 361 UK authorities

10–19%: 3 authorities 20–29%: 2 authorities 30–39%: 3 authorities 40–49%: 10 authorities 50–59%: 24 authorities 60–69%: 65 authorities 70–79%: 103 authorities North Hertford… 80–89%: 93 authorities 90–99%: 58 authorities 0% 100%

every UK local authority, bucketed by full-fibre coverage

Source: Ofcom Connected Nations 2025 (July 2025, r01)

Full Coverage Data

Metric Coverage Definition
Full-Fibre (FTTP) 68.7% Fibre to the Premises, optical fibre all the way to the property
Gigabit-Capable 84.5% ≥1,000 Mbit/s download speed available
Ultrafast Broadband (≥300 Mbit/s) 85% UFBB - ≥300 Mbit/s download speed available
Ultrafast (≥100 Mbit/s) 85.7% ≥100 Mbit/s download speed available
Superfast (≥30 Mbit/s) 98% SFBB - ≥30 Mbit/s download speed available
NGA (any next-generation access) 99.2% Any NGA network available
Fixed Wireless Access (FWA) 0.2% Wireless-only fixed broadband (no physical cable)
Below USO Threshold 0.1% Below 10 Mbit/s down / 1 Mbit/s up USO minimum
Full-Fibre Take-Up (all premises) 29% % of all premises actively using a full-fibre connection
Full-Fibre Take-Up (covered premises) 42% % of premises where FTTP is available that have taken it up
Total Premises 62,904 All premises in Ofcom's matched dataset
National Rank (Full-Fibre) #260 / 361 Ranking among all UK local authorities by full-fibre coverage

Coverage Analysis

North Hertfordshire's full-fibre coverage of 68.7% places it at rank 260 nationally. The gap between full-fibre availability (68.7%) and gigabit availability (84.5%) reflects whether any qualifying cable networks supplement the FTTP rollout in this district. Where the two figures are close, full-fibre is effectively the sole gigabit delivery mechanism.

Superfast coverage at 98% gives a sense of the floor for most residents, the majority of premises in North Hertfordshire can receive at least 30 Mbit/s. The USO gap of 0.1% represents premises that cannot yet access the government-mandated minimum of 10 Mbit/s download and 1 Mbit/s upload. In rural local authorities this figure can reach double digits; in dense urban areas it typically approaches zero.

Take-up data provides a demand-side view. With 29% of all premises actively using full-fibre, North Hertfordshire gives a clear picture of how quickly residents are switching to future-proof connections as they become available.

Related

Compare all local authorities

Frequently Asked Questions

What is the full-fibre broadband coverage in North Hertfordshire?

According to Ofcom Connected Nations 2025 (July 2025, r01), 68.7% of premises in North Hertfordshire have access to full-fibre (FTTP) broadband. Full-fibre connects properties using optical fibre all the way from the exchange, enabling gigabit-speed connections. The UK national average is approximately 77.5%.

How does North Hertfordshire compare nationally for broadband coverage?

North Hertfordshire ranks 260th out of 361 UK local authorities by full-fibre coverage (68.7%). Gigabit-capable coverage stands at 84.5% and superfast (≥30 Mbit/s) coverage at 98%. Figures are from Ofcom Connected Nations 2025.

Does North Hertfordshire meet the broadband Universal Service Obligation?

The Broadband Universal Service Obligation (USO) guarantees access to at least 10 Mbit/s download and 1 Mbit/s upload. In North Hertfordshire, 0.1% of premises fall below this threshold. If your property cannot receive the USO minimum, you may be able to request a qualifying connection from an eligible provider. See Ofcom's guidance for details.

Source: Ofcom, Connected Nations 2025, UK Fixed Broadband Coverage (July 2025, r01). Retrieved and formatted by PlainBroadband Editorial. Disclaimer: Coverage figures show availability, not guaranteed service quality or actual take-up. Published under the Open Government Licence v3.0.