Home / Constituencies / BROMSGROVE

BROMSGROVE Broadband Coverage

Westminster parliamentary constituency · England · 45,875 premises

Full-fibre coverage of 80.3% in BROMSGROVE is below the UK national average of 81%.

The verdict

BROMSGROVE ranks #374 of 650 constituencies for full-fibre (80.3%) and #308 for the fixed/FWA availability gap (0.0%) - those two corpus maps diverge.

#374 of 650 constituencies (full-fibre)
#308 of 650 for fixed/FWA gap
80.3% full-fibre (FTTP)
80.3%
Full-fibre (FTTP)
85.1%
Gigabit-capable · bottom third
97.9%
Superfast (≥30 Mbit/s) · middle third
85.0%
Ultrafast (≥300 Mbit/s) · bottom third
0.0%
No decent fixed/FWA broadband · middle third

Broadband Coverage in BROMSGROVE

On the Ofcom register, BROMSGROVE (England) lists 45,875 premises. Full-fibre (FTTP) is available to 80.3% of them, above-average nationally, and the gigabit-capable figure climbs to 85.1% once DOCSIS 3.1 cable upgrades are included. 97.9% get superfast (30 Mbit/s or more) service, and 85.0% get ultrafast (300 Mbit/s or more).

On connectivity for all households, BROMSGROVE has near-universal fixed and fixed-wireless broadband availability: fewer than 1% of premises cannot receive a decent service. Mid-pack full-fibre at 80.3% is 0.7pp below the 81% UK average; gigabit-capable coverage is 85.1% and ultrafast 85.0%.

Where these figures come from

Figures are drawn from Ofcom's Connected Nations Spring 2026 report (January 2026 snapshot, published May 2026 (r1)), which aggregates postcode-sector data to constituency level. They represent coverage availability from at least one network operator, not the proportion of households that have subscribed to a given speed tier, nor the typical or guaranteed speeds that customers actually receive. Nearby constituencies in England with comparable full-fibre coverage are listed below.

Coverage Metrics

Full-fibre (FTTP)80.3%Gigabit-capable85.1%Superfast (≥30 Mbit/s)97.9%Ultrafast (≥300 Mbit/s)85%
Broadband coverage metrics for BROMSGROVE - Ofcom Connected Nations Spring 2026

Where BROMSGROVE Sits Nationally

BROMSGROVE vs every UK parliamentary constituency

Full-fibre coverage distribution across all 650 UK constituencies. BROMSGROVE's 80.3% places it in the highlighted band.

80.3% 374th of 650 higher than 274 of 650 UK constituencies

every UK parliamentary constituency, bucketed by value

Each bar is a band; taller bars hold more UK constituencies. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source Ofcom Connected Nations Spring 2026 · January 2026 snapshot, published May 2026 (r1)

What to do next

All constituencies · UK rankings · My watchlist

Related

Compare constituencies head-to-head

Read our methodology : how this data is sourced, computed, and verified.

Nationwide constituencies with similar full-fibre or gigabit coverage

Two Ofcom peer sets for BROMSGROVE (mid-pack full-fibre at 80.3%), both outside England so the neighborhoods are not the same-nation Nearby block above.

Similar full-fibre

Nearest other-nation constituencies by full-fibre coverage (80.3% here; floor ≥5,000 premises).

Similar gigabit

Nearest other-nation constituencies by gigabit-capable coverage (85.1% here).

Frequently Asked Questions

Where does BROMSGROVE sit in the national full-fibre distribution?

BROMSGROVE has 80.3% full-fibre coverage, 0.7pp below the 81% UK average (rank #374 of 650), higher than 274 of 650 UK constituencies. Gigabit-capable coverage is 85.1%.

What share of BROMSGROVE premises still lack decent fixed/FWA broadband?

Ofcom's Spring 2026 measure shows all measured premises in BROMSGROVE can receive decent fixed or fixed-wireless broadband. Ultrafast (≥300 Mbit/s) coverage is 85.0%.

What 80.3% full-fibre means for BROMSGROVE

BROMSGROVE is 0.7pp behind the 81% UK average, worth checking your own address before assuming the gap applies to you.

Coverage figures are Ofcom Connected Nations availability data, not a guarantee of service at any single address; always check before switching.

Source: Ofcom Connected Nations Spring 2026, January 2026 release (r1). Published under the Open Government Licence v3.0. Figures represent premises-level coverage availability, not actual subscriptions or speeds experienced.

This constituency's figures are computed directly from Ofcom Connected Nations data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.