UK Local Authority Broadband Coverage

This table lists broadband coverage statistics for all 361 UK local authority districts as measured by Ofcom in its Connected Nations 2025 report (July 2025, r01). Figures show the percentage of premises in each authority with access to full-fibre (FTTP), gigabit-capable, superfast (≥30 Mbit/s), and USO-grade (≥10 Mbit/s / 1 Mbit/s up) connections. Use the sort controls to rank authorities by any metric, the alphabet index to jump to a letter, or the nation filter to compare within England, Scotland, Wales, or Northern Ireland. Click any authority name to see the full detail page with charts, national rank, and take-up statistics.

Showing 10 authorities starting with "G"

Authority Nation Premises Full-Fibre % Gigabit % Superfast % USO Gap %
Gateshead England 103,173 70.9% 87.1% 97.2% 0%
Gedling England 57,658 79.8% 93.1% 99% 0%
Glasgow City Scotland 346,422 91.5% 94.6% 98.5% 0%
Gloucester England 62,301 56.2% 93.7% 99.4% 0%
Gosport England 39,453 91.5% 97.6% 99.9% 0%
Gravesham England 46,903 71.7% 81.9% 97.8% 0.1%
Great Yarmouth England 50,577 78.4% 83.5% 98.9% 0%
Greenwich England 129,279 76.9% 89.1% 99.5% 0%
Guildford England 61,739 63.1% 79.4% 98% 0.1%
Gwynedd Wales 68,690 62.4% 62.4% 93.5% 0.8%

Column Definitions

Full-Fibre %
— Premises with FTTP (Fibre to the Premises) available.
Gigabit %
— Premises with ≥1,000 Mbit/s download speed available.
Superfast %
— Premises with ≥30 Mbit/s (SFBB) available.
USO Gap %
— Premises below the 10 Mbit/s / 1 Mbit/s USO threshold.

Source: Ofcom, Connected Nations 2025 — UK Fixed Broadband Coverage (July 2025, r01). Data compiled and verified by Kiznis Studio Editorial. Published under the Open Government Licence v3.0.